Fondations spéciales et BTP - Travaux maritimes

PROJET KONOIKE

PROJET KONOIKE

  • DATE DE RÉALISATION :MARS 2019
  • LIEU :Abidjan, Côte d'Ivoire
  • VALEUR : CONFIDENTIEL
  • TYPE DE PROJET : TRAVAUX MARITIMES
DESCRIPTION DU PROJET

The Multi Tier Racking System is the optimal solution for manual storage where available space is limited. Therefore, this storage system is selective, as it allows immediate access to all unit loads and/or references stored; and versa tile, given its adaptability to any type of unit load.

This storage system provides excellent maximization of height by creating different aisle load levels high which are accessed by means of stairs.

SPÉCIFICATION DU PROJET

The Multi Tier Racking System is the optimal solution for manual storage where available space is limited. Therefore, this storage system is selective, as it allows immediate access to all unit loads.

  • Max. Working temperature: At10 bar (1 mpa): 50°C.
  • Threaded port: 1/8-1/4.
  • Flow rate: 6 bar up=1 [Nl/min]: 600.
  • Max. Operating pressure: 13 bar (1.3 mpa).
  • Degree of filtration: 5-20-50 am.
DURÉE DU PROJET

The Multi Tier Racking System is the optimal solution for manual storage where available space is limited. Therefore, this storage system.

  • Max. Working temperature: At10 bar (1 mpa): 50°C
  • Many years of experience based on a large number of projects
  • System can be expanded with the relevant planning
  • Quality steel and high quality workmanship
  • Pipeline monitoring & control using GSM/GPRS network
project-dtl
project-dtl
project-dtl